extra long night safety lead - 5M/16ft
$2600 USD
Take your fast and energetic dog for long walks with this sturdy, reflective long leash, that gives you good control over your pup, while allowing them plenty of space to run and explore!
size: 5 meters long / 16 feet long
features:
- 100% polyester
- signature "puppia" logo
- designed in Korea